Project

For W3C

 Project Justification

 

At the time this project was conceived, there was no other Power Generation Project under

planning in Bhavnagar District as well as in the neighboring Districts.

Demand of Saurashtra region at the time was more than 1500 MW.

Availability of Lignite reserve for Power Project in the District: 130 MMT.

 

Power Demand Supply Position

Installed Capacity as on March 2007
Peak demand in 2007 10605 MW
Capacity required to meet the demand 12476 MW
Installed Capacity as on March 2007 9247 MW
Deficit 3229 MW
Projected peak demand in 2012 (As per 16th EPS of CEA) 14031 MW
Inst. Capacity required to meet this demand 16507 MW
Additional capacity required during XI Plan 7360 MW

 

Hence, setting up of this project with capacity as 500 MW (2 X 250 MW) was planned.

 Regional Importance

Regional Importance of the Projects

No Power Generation Project in Bhavnagar District as well as neighboring Districts

Demand of Saurashtra region more than 1500 MW

Lignite reserve for Power Project in the District : 130 MMT

Designed Capacity of Power Project 500+20%MW



 Climatological Data

Climatological Data

Nearest Meteorological Station Bhavnagar
Maximum Temp. 46.70 C
Minimum Temp. 6.00 C
Av.Annual Rainfall 660.8 mm
Av.Relative Humidity 48%
Highest Wind speed 61km/hr

 Clearances Data

Environment Clearance

MoEF Clearance
Compliance to the EC conditions

 

Project Statutory Clearances:

Sr. No. Approving Authorities Type of Approval Date of Approval
1 Gujarat Maritime Board ‘In Principle’ approval 26/12/2007
Construction approval 29/07/2011
2 Conservator of Forest Sanctuary/National Park 04/07/2008
3 Gujarat Water Infrastructure Ltd. Approval for Water Supply 09/07/2008
4 Gujarat Pollution Control Board NoC for Air & Water Pollution 06/08/2008
5 Airport Authority of India NOC for Chimney 05/06/2009
6 Ministry of Environment & Forest (MoEF) Environmental Clearance 10/02/2010
CRZ Clearance 16/03/2010
7 Petroleum & Explosives Safety Organization (PESO) (Ministry of Commerce & Industry) Storage of Petroleum Class “C” 09/02/2015

 Other Details

 

Other Details

Process Circulating Fluidized Bed Combustion (CFBC) Technology (Boiler & Steam driven turbine)
Lignite 3.82 MTPA
Limestone 0.97 MTPA
Fly Ash 252.7 TPH in Dry form
Water (1) Sea water - 4420 m3/hr from Gulf of Khambat for Cooling purposes
(2)Raw water - 185 m3/hr from GWIL pumping station at Budhel
Land 171 Ha approx. (acquired)
R & R Nil
Construction Power 2.4 MVA from sub-station at Bhumbhli
Man power Around 330

 

Tariff Petition

Summary of Tariff Petition – English Download
Summary of Tariff Petition – Gujarati Download
BECL Tariff Petition Download
Public Notice on Tariff Petition - English Download
Public Notice on Tariff Petition - Gujarati Download
Auditor Capex Certificate as on 31.10.2015 Download

 

Financial

Annual Report – 2014-15 Download

 Location Information

Location Information:

 

Location of Project: Village – Padva,
Taluka Ghogha,
Bhavnagar District,
Gujarat
Lignite reserve for Power Project: 130 MMT
Nearest Railway Station: Bhavnagar, 25 Kms
Nearest Airport: Bhavnagar, 25 Kms
Nearest Sea Port: Pipavav
Latitude /Longitude of site: 21° 35 ' North / 72° 14 ' East
Site elevation: average 40 meter above MSL
Seismic Zone: Zone – III, as per IS: 1893

 Project Location

PROJECT SITE (STATE) LOCATION




SEISMIC ZONE MAP OF INDIA



SEISMIC ZONE MAP OF INDIA




Pause Stop
16 Oct
BECL/CO/HR/2017-18/ET/SP
11 Oct
BECL/Site/Civil/2017-18/3
11 Oct
BECL/Site/Civil/2017-18/2
14 Oct
RFQ NO: BECL/SITE/M/17-18/ RFQ/Fastners/CG-4
5 Jun
Appointment of Independent Director